First day of work on site
Today is the first day of physical work on the site. Ground&Water are carrying out drilling down to 15 metres deep to prepare the soil investigation report. This is essential for the calculations for the basement design. Drills! Ground&Water protecting our neighbours lawn: The equipment is on site! A sample collected from the drill: Deep hole: Collected soil samples for the analysis: We needed to use brutal force to get the drilling equipment to the old tennis court: The equipment is on the tennis court. This is the second and final hole
Site Clearance - Day 1
The day started with a pre-commencement meeting and planning with our arborist Alex and ecologist Mike Then the machinery arrived at 8:30am: Road safety first: First cut - clearing the entrance to the site: The entrance hedge is disappearing very quickly: Bolts on the grinding machine: The entrance is cleared and the machinery is on site: Bushes on the left are very established with thick trunks: and they are gone: Fly over the work in progress: Working hard: Starting on 2 large cypress trees: Lower part of cypress trees cleared: And they are gone:


Comments
Post a Comment