First day of work on site
Today is the first day of physical work on the site. Ground&Water are carrying out drilling down to 15 metres deep to prepare the soil investigation report. This is essential for the calculations for the basement design.
Drills!
Ground&Water protecting our neighbours lawn:
The equipment is on site!
A sample collected from the drill:
Deep hole:
Collected soil samples for the analysis:
We needed to use brutal force to get the drilling equipment to the old tennis court:
The equipment is on the tennis court. This is the second and final hole
Drills!
Ground&Water protecting our neighbours lawn:
The equipment is on site!
A sample collected from the drill:
Deep hole:
Collected soil samples for the analysis:
We needed to use brutal force to get the drilling equipment to the old tennis court:
The equipment is on the tennis court. This is the second and final hole