Sewer connection
Sewer connection completed on 12 Aug. The two new connections have been made. Existing gully connection has been broken out as it was bedded into the existing concrete haunching. This will be replaced.
Sewer connection completed on 12 Aug. The two new connections have been made. Existing gully connection has been broken out as it was bedded into the existing concrete haunching. This will be replaced.