Formations for the capping beam Get link Facebook X Pinterest Email Other Apps October 28, 2020 Read more
Preparing for the capping beam installation next week Get link Facebook X Pinterest Email Other Apps October 23, 2020 Read more
Cutting the piles Get link Facebook X Pinterest Email Other Apps October 09, 2020 Exposing the piles The tool attached, ready for cutting Read more
Betty arrives Get link Facebook X Pinterest Email Other Apps October 08, 2020 Komatsu PC228 , nicknamed Betty, 25 ton excavator arrived today. This should speed up the digging! Read more
Health and Safety inspection on site Get link Facebook X Pinterest Email Other Apps October 08, 2020 Health & Safety officer walking the site Read more
Yellow Army Get link Facebook X Pinterest Email Other Apps October 06, 2020 30 trucks of soil removed from the site today Read more
Piling completed Get link Facebook X Pinterest Email Other Apps October 01, 2020 Forming the retaining boundary wall and basement, over 70 reinforced concrete piles, 10 metres deep with king post steels inserted 3 metres apart. All completed ahead of schedule. Read more